Pre-order Update 29/10/2025

It’s been about a month and a half since the pre-orders were opened. A lot has happened since then, so it’s only fair to update everyone on what’s been happening behind the scenes. Thank you again for all the support. I hope this update helps clarify where we are in the process.

Drivers

The production driver samples were validated shortly after CanJam SoCal. The full production batch has now been ordered and is scheduled to arrive in early December.

Cases

The case moulds were validated last week, and production has now begun. A sample will be shipped to us within the next couple of weeks. Once the sample is approved, production will take approximately 30–40 days to complete. We will post pictures of the case as soon as the sample arrives.

Carbon Fibre Headbands

The prototype headbands were sent to our production partner and have since been validated. The moulds are complete and the first sample should be produced and with us sometime in December. There was a small delay due to the Golden Week holiday in China and shipping congestion for our samples, but everything is back on track.

3D Printed Nylon Parts

We are currently in the process of selecting the best manufacturing partner for these components. There are several strong options and the decision should be finalised in the second half of November.

Sliding Mechanism and Yoke Metal Parts

Our in-house CNC machine arrived about a week ago, and we’ve been finalising the design and mounting of different parts of the sliding mechanism and yoke to ensure maximum durability. Once finalised, these parts will be produced by our machining partners. We are aiming to place the production order around the middle of November as the lead time for these components is relatively short.

Grills

After testing and careful consideration, we decided to go with CNC machining for the grills rather than metal 3D printing. The finish and durability of the SLM printed grills did not meet our quality standards. The grills have already been ordered, and finish samples will arrive in November, with batch production to follow shortly after approval.

Cable Parts

The barrels and splitters have been validated for production and are now with our partners. They should be completed in around one month. The wire has already been produced and is waiting for the remaining parts so assembly can begin.